The article describes the fundamental geotechnical model assumptions in the design phase of the Semmering Base Tunnel. Two selected case studies show the verification of the geotechnical model during tunnel construction. The verification process is essentially based on geotechnical monitoring in combination with specific back analyses. It is shown that particularly in complex geotechnical conditions, such as deep tunnels in weak rock mass, the designer can only assess a range of expected behaviour. Most information about system behaviour and thus about the geotechnical model conceptions can only be gained during construction. An improved understanding of the geotechnical model provides the potential to identify and minimize geotechnical risks earlier and to adapt excavation and support measures to the actual conditions.
Der Beitrag beschreibt die Grundzüge der geotechnischen Modellbildung am Semmering‐Basistunnel in der Planungsphase und thematisiert dabei verbleibende Modellunsicherheiten. Anhand zweier Fallbeispiele aus den bereits aufgefahrenen Abschnitten wird gezeigt, wie die Modellvorstellungen während der Ausführungsphase verifiziert werden können. Dies erfolgt abgestimmt auf die jeweilige Modellvorstellung durch geotechnische Messungen in Kombination mit Rückrechnungen. Es wird gezeigt, dass in der Planungsphase insbesondere unter komplexen geotechnischen Verhältnissen zwar ein Rahmen des zu erwartenden Systemverhaltens definiert werden kann, ein Großteil der Erkenntnisse hinsichtlich der geotechnischen Modellvorstellungen aber erst im Zuge der Ausführung gewonnen wird bzw. gewonnen werden kann. Diese Erkenntnisse können aber genutzt werden, um geotechnische Modelle weiterzuentwickeln und so Risiken für die weiteren Arbeiten zu erkennen und um Maßnahmen an die tatsächlich angetroffenen Verhältnisse anzupassen.
Semmering Base Tunnel – Geotechnical models in design and construction
Semmering‐Basistunnel – Geotechnische Modelle in Planung und Bau
The article describes the fundamental geotechnical model assumptions in the design phase of the Semmering Base Tunnel. Two selected case studies show the verification of the geotechnical model during tunnel construction. The verification process is essentially based on geotechnical monitoring in combination with specific back analyses. It is shown that particularly in complex geotechnical conditions, such as deep tunnels in weak rock mass, the designer can only assess a range of expected behaviour. Most information about system behaviour and thus about the geotechnical model conceptions can only be gained during construction. An improved understanding of the geotechnical model provides the potential to identify and minimize geotechnical risks earlier and to adapt excavation and support measures to the actual conditions.
Der Beitrag beschreibt die Grundzüge der geotechnischen Modellbildung am Semmering‐Basistunnel in der Planungsphase und thematisiert dabei verbleibende Modellunsicherheiten. Anhand zweier Fallbeispiele aus den bereits aufgefahrenen Abschnitten wird gezeigt, wie die Modellvorstellungen während der Ausführungsphase verifiziert werden können. Dies erfolgt abgestimmt auf die jeweilige Modellvorstellung durch geotechnische Messungen in Kombination mit Rückrechnungen. Es wird gezeigt, dass in der Planungsphase insbesondere unter komplexen geotechnischen Verhältnissen zwar ein Rahmen des zu erwartenden Systemverhaltens definiert werden kann, ein Großteil der Erkenntnisse hinsichtlich der geotechnischen Modellvorstellungen aber erst im Zuge der Ausführung gewonnen wird bzw. gewonnen werden kann. Diese Erkenntnisse können aber genutzt werden, um geotechnische Modelle weiterzuentwickeln und so Risiken für die weiteren Arbeiten zu erkennen und um Maßnahmen an die tatsächlich angetroffenen Verhältnisse anzupassen.
Semmering Base Tunnel – Geotechnical models in design and construction
Semmering‐Basistunnel – Geotechnische Modelle in Planung und Bau
Lenz, Gerold (author) / Poisel, Alexander (author) / Brandtner, Markus (author) / Goricki, Andreas (author) / Wagner, Oliver K. (author)
Geomechanics and Tunnelling ; 11 ; 559-565
2018-10-01
7 pages
Article (Journal)
Electronic Resource
German
Semmering Base Tunnel, Austria