A platform for research: civil engineering, architecture and urbanism
Using negotiated guidelines in a facility upgrade
In Ohio, approval criteria for high‐rate processes are used to design a treatment plant upgrade that secures the required state approval.
In Ohio, the use of high‐rate treatment processes requires prior approval from the Ohio Environmental Protection Agency. Approval criteria for high‐rate processes were developed and used for the first time in a study commissioned by the Cleveland Division of Water. The study developed data that aided in the design of an expansion project for the Crown Water Treatment Plant. Data from a pilot‐scale study, which examined the efficiency of high‐rate clarification and high‐rate filtration, confirmed that tube settlers and filters with 1,830 mm (72 in.) of 1‐mm effective size anthracite were appropriate for the plant's expansion and upgrade.
Using negotiated guidelines in a facility upgrade
In Ohio, approval criteria for high‐rate processes are used to design a treatment plant upgrade that secures the required state approval.
In Ohio, the use of high‐rate treatment processes requires prior approval from the Ohio Environmental Protection Agency. Approval criteria for high‐rate processes were developed and used for the first time in a study commissioned by the Cleveland Division of Water. The study developed data that aided in the design of an expansion project for the Crown Water Treatment Plant. Data from a pilot‐scale study, which examined the efficiency of high‐rate clarification and high‐rate filtration, confirmed that tube settlers and filters with 1,830 mm (72 in.) of 1‐mm effective size anthracite were appropriate for the plant's expansion and upgrade.
Using negotiated guidelines in a facility upgrade
Pizzi, Nicholas G. (author) / Schwarzwalder, Ronald O. (author) / Sadzewicz, John J. (author)
Journal ‐ American Water Works Association ; 89 ; 89-95
1997-03-01
7 pages
Article (Journal)
Electronic Resource
English
Design , Treatment Plants , Filtration , Clarification , Ozonation , Coal , Loading
Recommendations for negotiated agreements
Online Contents | 2002
|Urban Informality and Negotiated Space
Taylor & Francis Verlag | 2011
|Tourist facility upgrade in PE
British Library Online Contents | 2004
Testing the "negotiated city" - Round tables - Urban engineering and myths of the negotiated city
Online Contents | 2008
|