Design and construction of the tunnel geothermal system in Jenbach / Planung und Bau der Tunnel‐Geothermieanlage in Jenbach
On contract H8 – Tunnel Jenbach on the northern approach route to the Brenner Base Tunnel, a 54 km section of tunnel is currently being equipped with a geothermal system making use of energy lining segments, which enable the laying of absorber pipework in the TBM‐driven tunnel. The system will be able to supply energy to the building yard in Jenbach though a connection in the emergency exit shaft. The design of the geothermal energy system covers the design of the energy segments, the sizing of the geothermal system, the installation of the segments in the tunnel and connecting them together in the tunnel and the laying of the connection pipework. Various restrictions resulting from the practicalities of tunnel construction had to be taken into account in the geothermal system. This article describes the experience gained during the design phase and the current state of the works. Then follows a discussion of the conditions for the future application of geothermal systems in tunnels.
Im Baulos H8 – Tunnel Jenbach, als Teil der Zulaufstrecke Nord zum Brenner Basistunnel, wird derzeit ein 54 m langer Tunnelabschnitt mit einer geothermischen Anlage ausgerüstet. Dabei kommen so genannte Energietübbinge zum Einsatz, welche die Verlegung von Absorberleitungen in TBM‐vorgetriebenen Tunneln ermöglichen. Die Anlage wird über einen Notaustiegsschacht mit dem Bauhof der Gemeinde Jenbach verbunden, um diesen in Zukunft mit Wärmeenergie zu versorgen. Die Planung der Geothermieanlage erstreckte sich von der Bemessung der Energietübbinge, der Dimensionierung der Geothermieanlage, dem Einbau der Energietübbinge in den Tunnel, die Verbindung der Energietübbinge untereinander im Tunnel bis zur Verlegung der Anschlussleitungen. Dabei mussten zahlreiche tunnelbauspezifische Randbedingungen beachtet und mit den Erfordernissen der technischen Gebäudeplanungen abgestimmt werden. Dieser Beitrag berichtet über die in der Planungsphase gewonnenen Erfahrungen und stellt den derzeitigen Stand der Arbeiten vor. Abschließend wird diskutiert, unter welchen Rahmenbedingungen geothermische Systeme in zukünftigen Tunnelprojekten integriert werden könnten.
Design and construction of the tunnel geothermal system in Jenbach / Planung und Bau der Tunnel‐Geothermieanlage in Jenbach
On contract H8 – Tunnel Jenbach on the northern approach route to the Brenner Base Tunnel, a 54 km section of tunnel is currently being equipped with a geothermal system making use of energy lining segments, which enable the laying of absorber pipework in the TBM‐driven tunnel. The system will be able to supply energy to the building yard in Jenbach though a connection in the emergency exit shaft. The design of the geothermal energy system covers the design of the energy segments, the sizing of the geothermal system, the installation of the segments in the tunnel and connecting them together in the tunnel and the laying of the connection pipework. Various restrictions resulting from the practicalities of tunnel construction had to be taken into account in the geothermal system. This article describes the experience gained during the design phase and the current state of the works. Then follows a discussion of the conditions for the future application of geothermal systems in tunnels.
Im Baulos H8 – Tunnel Jenbach, als Teil der Zulaufstrecke Nord zum Brenner Basistunnel, wird derzeit ein 54 m langer Tunnelabschnitt mit einer geothermischen Anlage ausgerüstet. Dabei kommen so genannte Energietübbinge zum Einsatz, welche die Verlegung von Absorberleitungen in TBM‐vorgetriebenen Tunneln ermöglichen. Die Anlage wird über einen Notaustiegsschacht mit dem Bauhof der Gemeinde Jenbach verbunden, um diesen in Zukunft mit Wärmeenergie zu versorgen. Die Planung der Geothermieanlage erstreckte sich von der Bemessung der Energietübbinge, der Dimensionierung der Geothermieanlage, dem Einbau der Energietübbinge in den Tunnel, die Verbindung der Energietübbinge untereinander im Tunnel bis zur Verlegung der Anschlussleitungen. Dabei mussten zahlreiche tunnelbauspezifische Randbedingungen beachtet und mit den Erfordernissen der technischen Gebäudeplanungen abgestimmt werden. Dieser Beitrag berichtet über die in der Planungsphase gewonnenen Erfahrungen und stellt den derzeitigen Stand der Arbeiten vor. Abschließend wird diskutiert, unter welchen Rahmenbedingungen geothermische Systeme in zukünftigen Tunnelprojekten integriert werden könnten.
Design and construction of the tunnel geothermal system in Jenbach / Planung und Bau der Tunnel‐Geothermieanlage in Jenbach
Frodl, Stephan (author) / Franzius, Jan Niklas (author) / Bartl, Thomas (author)
Geomechanics and Tunnelling ; 3 ; 658-668
2010-10-01
11 pages
Article (Journal)
Electronic Resource
English
Innovative procedures/Test techniques ‐ Neue Verfahren/Versuchstechnik , pipe run , Mechanized tunnelling ‐ Maschineller Vortrieb , Leitungsführung , vertragliche Aspekte , Geothermal energy ‐ Geothermie , wasserrechtliche Bewilligung , energy segment , Verbindung der Absorberleitungen , contractual aspects , approval under water law , Energietübbing , exploiting the thermal energy , Wärmenutzung , connection of absorber pipes