A platform for research: civil engineering, architecture and urbanism
Investigation and planning for the refurbishment of the original Tauern Tunnel / Vorerkundung und Planung der Sanierung der ersten Röhre des Tauerntunnels
The extent of tunnel refurbishment has increased constantly in recent years. The particular importance of meticulous and thought‐out planning has been demonstrated on recent projects. The original drawings often provide an insufficient basis for design work and have to be checked, verified or supplemented by targeted investigation measures. A brief glance at the list of claims from a refurbishment project can clearly demonstrate the potential savings, which could have been produced by relatively cheap investigations. For the planning and design of the refurbishment of the first tube of the Tauern Tunnel, many staged investigation surveys were therefore carried out. The investigation measures carried out and their results and effect on the design and tender documents for the refurbishment of the existing tube of the Tauern Tunnel are described in this article.
In den letzten Jahren ist der Umfang der Tunnelsanierungen stetig gestiegen. Die bei Sanierungsmaßnahmen besonders große Bedeutung einer sorgfältigen und durchdachten Planung konnte bei den jüngst ausgeführten Projekten erkannt werden. Alte Baupläne sind oft nur eine sehr unzureichende Planungsgrundlage, die durch gezielte Erkundungsmaßnahmen abgesichert, verifiziert oder ergänzt werden sollten. Ein kurzer Blick auf die Liste der Mehrkostenforderungen bei Sanierungsprojekten zeigt in eindrucksvoller Weise das Einsparpotenzial, das mit vergleichsweise kostengünstigeren Erkundungsmaßnahmen hätte erzielt werden können. Für die Planung der Sanierung der ersten Röhre des Tauerntunnels wurden daher mehrere, zeitlich gestaffelte Erkundungsprogramme durchgeführt. Die durchgeführten Erkundungsmaßnahmen sowie deren Ergebnisse und Auswirkungen auf die Planung und Ausschreibung der Sanierung der Bestandsröhre des Tauerntunnels werden im vorliegenden Beitrag vorgestellt.
Investigation and planning for the refurbishment of the original Tauern Tunnel / Vorerkundung und Planung der Sanierung der ersten Röhre des Tauerntunnels
The extent of tunnel refurbishment has increased constantly in recent years. The particular importance of meticulous and thought‐out planning has been demonstrated on recent projects. The original drawings often provide an insufficient basis for design work and have to be checked, verified or supplemented by targeted investigation measures. A brief glance at the list of claims from a refurbishment project can clearly demonstrate the potential savings, which could have been produced by relatively cheap investigations. For the planning and design of the refurbishment of the first tube of the Tauern Tunnel, many staged investigation surveys were therefore carried out. The investigation measures carried out and their results and effect on the design and tender documents for the refurbishment of the existing tube of the Tauern Tunnel are described in this article.
In den letzten Jahren ist der Umfang der Tunnelsanierungen stetig gestiegen. Die bei Sanierungsmaßnahmen besonders große Bedeutung einer sorgfältigen und durchdachten Planung konnte bei den jüngst ausgeführten Projekten erkannt werden. Alte Baupläne sind oft nur eine sehr unzureichende Planungsgrundlage, die durch gezielte Erkundungsmaßnahmen abgesichert, verifiziert oder ergänzt werden sollten. Ein kurzer Blick auf die Liste der Mehrkostenforderungen bei Sanierungsprojekten zeigt in eindrucksvoller Weise das Einsparpotenzial, das mit vergleichsweise kostengünstigeren Erkundungsmaßnahmen hätte erzielt werden können. Für die Planung der Sanierung der ersten Röhre des Tauerntunnels wurden daher mehrere, zeitlich gestaffelte Erkundungsprogramme durchgeführt. Die durchgeführten Erkundungsmaßnahmen sowie deren Ergebnisse und Auswirkungen auf die Planung und Ausschreibung der Sanierung der Bestandsröhre des Tauerntunnels werden im vorliegenden Beitrag vorgestellt.
Investigation and planning for the refurbishment of the original Tauern Tunnel / Vorerkundung und Planung der Sanierung der ersten Röhre des Tauerntunnels
Kohlböck, Bernhard (author) / Moser, Herwig (author)
Geomechanics and Tunnelling ; 3 ; 379-390
2010-08-01
12 pages
Article (Journal)
Electronic Resource
English
Verstärkung Sohlgewölbe , Erkundungsmaßnahmen , invert heaves , concrete refurbishing , Betonsanierung , Fahrbahnentwässerung , Erkundung Lichtraum , Sohlhebungen , carriageway drainage , formation water drainage , Straßentunnel , Sanierung , refurbishing , strengthening of the invert arch , road tunnels , Bergentwässerung , survey of clearance , survey measures
Investigation and planing for the refurbishment of the original Tauern Tunnel
Tema Archive | 2010
|Wiley | 2008
|Wiley | 2013
|