Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The design and performance during construction of the propped secant pile wall at Holborn Bars London
The design and performance during construction of the propped secant pile wall at Holborn Bars London
The design and performance during construction of the propped secant pile wall at Holborn Bars London
Ward, K. (Autor:in) / Clayton, C. R. I. / Institution of Civil Engineers
Conference, Retaining structures ; 1992 ; Cambridge
Retaining structures ; 216-226
01.01.1993
11 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A temporary secant mini-pile wall propped by a deep jet grout raft
British Library Conference Proceedings | 1993
|Europäisches Patentamt | 2021
|