Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A temporary secant mini-pile wall propped by a deep jet grout raft
A temporary secant mini-pile wall propped by a deep jet grout raft
A temporary secant mini-pile wall propped by a deep jet grout raft
Newman, R. L. (Autor:in) / Covil, C. S. (Autor:in) / Clayton, C. R. I. / Institution of Civil Engineers
Conference, Retaining structures ; 1992 ; Cambridge
Retaining structures ; 478-487
01.01.1993
10 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 1993
|Parametric Study on the Performance of Temporary Secant Pile Wall
Springer Verlag | 2023
|Hard cutting secant pile secant surface wall brushing method
Europäisches Patentamt | 2023
|Effects of Change in the Support System on Temporary Secant Pile Wall
Springer Verlag | 2023
|