Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
First crossing problem for a suspension bridge being fatigue-degraded
First crossing problem for a suspension bridge being fatigue-degraded
First crossing problem for a suspension bridge being fatigue-degraded
Bryja, D. (Autor:in) / Sieniawska, R. (Autor:in) / Sniady, P. (Autor:in) / Lemaire, M. / Favre, J.-L. / Mebarki, A. / International Association for Civil Engineering, Reliability and Risk Analysis (CERRA)
International conference; 7th, Applications of statistics and probability to civil engineering ; 1995 ; Paris
01.01.1995
8 pages
Also known as ICASP 7. Vols 1 & 2 of 3 rec'd only
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cheon-Sa Bridge—The First Sea Crossing Multi-Span Suspension Bridge
Taylor & Francis Verlag | 2021
|Suspension bridge solves problem of crossing Rio Chiriqui in Panama
Engineering Index Backfile | 1917
|Crossing Lines: The Wheeling Suspension Bridge
ASCE | 2016
|Sea-crossing channel with suspension tunnel and deepwater suspension bridge
Europäisches Patentamt | 2020
|