A platform for research: civil engineering, architecture and urbanism
First crossing problem for a suspension bridge being fatigue-degraded
First crossing problem for a suspension bridge being fatigue-degraded
First crossing problem for a suspension bridge being fatigue-degraded
Bryja, D. (author) / Sieniawska, R. (author) / Sniady, P. (author) / Lemaire, M. / Favre, J.-L. / Mebarki, A. / International Association for Civil Engineering, Reliability and Risk Analysis (CERRA)
International conference; 7th, Applications of statistics and probability to civil engineering ; 1995 ; Paris
1995-01-01
8 pages
Also known as ICASP 7. Vols 1 & 2 of 3 rec'd only
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cheon-Sa Bridge—The First Sea Crossing Multi-Span Suspension Bridge
Taylor & Francis Verlag | 2021
|Suspension bridge solves problem of crossing Rio Chiriqui in Panama
Engineering Index Backfile | 1917
|Crossing Lines: The Wheeling Suspension Bridge
ASCE | 2016
|Sea-crossing channel with suspension tunnel and deepwater suspension bridge
European Patent Office | 2020
|