Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development of a 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus
Development of a 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus
Development of a 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus
Sasaki, K. (Autor:in) / Yamamoto, Y. (Autor:in) / Tsumura, K. (Autor:in) / Ouchi, S. (Autor:in) / Ballay, D. / International Association on Water Quality
Biennial conference; 18th, Part 1; Nutrient removal ; 1996 ; Singapore
01.01.1996
8 pages
Pts 1-5, 7 and 8 of 8 parts only held
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 1996
|Process Simulation to Optimize Nitrogen Removal in Intermittent Aeration Activated Sludge
British Library Conference Proceedings | 2010
|Mechanism and design of intermittent aeration activated sludge process for nitrogen removal
Taylor & Francis Verlag | 2011
|Mechanism and design of intermittent aeration activated sludge process for nitrogen removal
Online Contents | 2010
|British Library Conference Proceedings | 2000
|