A platform for research: civil engineering, architecture and urbanism
Development of a 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus
Development of a 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus
Development of a 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus
Sasaki, K. (author) / Yamamoto, Y. (author) / Tsumura, K. (author) / Ouchi, S. (author) / Ballay, D. / International Association on Water Quality
Biennial conference; 18th, Part 1; Nutrient removal ; 1996 ; Singapore
1996-01-01
8 pages
Pts 1-5, 7 and 8 of 8 parts only held
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 1996
|Process Simulation to Optimize Nitrogen Removal in Intermittent Aeration Activated Sludge
British Library Conference Proceedings | 2010
|Mechanism and design of intermittent aeration activated sludge process for nitrogen removal
Taylor & Francis Verlag | 2011
|Mechanism and design of intermittent aeration activated sludge process for nitrogen removal
Online Contents | 2010
|British Library Conference Proceedings | 2000
|