Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Treatment of Silt using Lime and PFA to form Embankment Fill for the New A13
Treatment of Silt using Lime and PFA to form Embankment Fill for the New A13
Treatment of Silt using Lime and PFA to form Embankment Fill for the New A13
Nettleton, A. (Autor:in) / Robertson, I. (Autor:in) / Smith, J. H. (Autor:in) / Rogers, C. D. F. / Glendinning, S. / Dixon, N. / Institution of Civil Engineers; East Midlands Geotechnical Group
Seminar, Lime stabilisation ; 1996 ; Loughborough
Lime stabilisation ; 159-175
01.01.1996
17 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Improving Expandable Embankment Fill Using Quick Lime
British Library Conference Proceedings | 2001
|Full-lateral blasting silt-squeezing embankment construction method
Europäisches Patentamt | 2024
|Engineering Index Backfile | 1963
|Silt Embankment Reinforced by Sleeve Valve Barrel Fracturing Grouting
Tema Archiv | 2012
|Silt Embankment Reinforced by Sleeve Valve Barrel Fracturing Grouting
Trans Tech Publications | 2012
|