Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Allowable grouting pressure during installation of non-circular sewer linings
Allowable grouting pressure during installation of non-circular sewer linings
Allowable grouting pressure during installation of non-circular sewer linings
International conference; 2nd, Ground improvement geosystems ; 1996 ; Tokyo
Ground improvement geosystems ; 209-214
01.01.1996
6 pages
Described as proceedings. Also known as IS-Tokyo'96
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Some aspects of composite circular sewer linings under installation conditions
Online Contents | 1999
|Role of temporary restraints during installation of sewer linings
British Library Conference Proceedings | 1997
|Structural design of closely packed horseshoe-shaped sewer linings during installation
Online Contents | 1999
|A New Design Method for Non-Circular Sewer Linings
British Library Conference Proceedings | 2000
|Pressure-tunnel linings with deep rock grouting
Springer Verlag | 1973
|