A platform for research: civil engineering, architecture and urbanism
Allowable grouting pressure during installation of non-circular sewer linings
Allowable grouting pressure during installation of non-circular sewer linings
Allowable grouting pressure during installation of non-circular sewer linings
International conference; 2nd, Ground improvement geosystems ; 1996 ; Tokyo
Ground improvement geosystems ; 209-214
1996-01-01
6 pages
Described as proceedings. Also known as IS-Tokyo'96
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Some aspects of composite circular sewer linings under installation conditions
Online Contents | 1999
|Role of temporary restraints during installation of sewer linings
British Library Conference Proceedings | 1997
|Structural design of closely packed horseshoe-shaped sewer linings during installation
Online Contents | 1999
|A New Design Method for Non-Circular Sewer Linings
British Library Conference Proceedings | 2000
|A new design method for non-circular sewer linings
Online Contents | 2000
|