Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sharing of risks under changed ground conditions in design/build contracts
Sharing of risks under changed ground conditions in design/build contracts
Sharing of risks under changed ground conditions in design/build contracts
John, M. (Autor:in) / Golser, J. / Hinkel, W. J. / Schubert, W. / International Tunnelling Association
World tunnel congress, Tunnels for people ; 1997 ; Vienna
01.01.1997
6 pages
Held in conjunction with the 23rd General assembly of the International Tunnelling Association
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Changed condition under contracts
Engineering Index Backfile | 1938
|Changed condition under contracts
Engineering Index Backfile | 1938
|Changed conditions clause in construction contracts
Engineering Index Backfile | 1964
|Changed Conditions Clause in Construction Contracts
ASCE | 2021
|