A platform for research: civil engineering, architecture and urbanism
Sharing of risks under changed ground conditions in design/build contracts
Sharing of risks under changed ground conditions in design/build contracts
Sharing of risks under changed ground conditions in design/build contracts
John, M. (author) / Golser, J. / Hinkel, W. J. / Schubert, W. / International Tunnelling Association
World tunnel congress, Tunnels for people ; 1997 ; Vienna
1997-01-01
6 pages
Held in conjunction with the 23rd General assembly of the International Tunnelling Association
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Changed condition under contracts
Engineering Index Backfile | 1938
|Changed condition under contracts
Engineering Index Backfile | 1938
|Changed conditions clause in construction contracts
Engineering Index Backfile | 1964
|Changed Conditions Clause in Construction Contracts
ASCE | 2021
|