Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
How good is an estimated logit model? Estimation accuracy analysed by Monte Carlo simulations
How good is an estimated logit model? Estimation accuracy analysed by Monte Carlo simulations
How good is an estimated logit model? Estimation accuracy analysed by Monte Carlo simulations
Brundell-Freij (Autor:in) / European Transport Forum
Seminar F, Transportation planning methods ; 1997 ; Uxbridge
01.01.1997
14 pages
Described as proceedings. Held as the 25th European Transport Forum annual meeting. Vol 2 of unknown no rec'd
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2014
|Accuracy of the Hodges–Lehmann estimates computed by applying Monte Carlo simulations
Online Contents | 2016
|Constrained nested logit model: formulation and estimation
Online Contents | 2017
|Estimation of a constrained multinomial logit model
Online Contents | 2012
|