Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rehabilitation of Bai Thuong Weir
Rehabilitation of Bai Thuong Weir
Rehabilitation of Bai Thuong Weir
Hutton, C. C. (Autor:in) / United States Committee on Large Dams
Annual lecture series; 19th, United States Committee on Large Dams; Dealing with aging dams ; 1999 ; Atlanta, GA
01.01.1999
16 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
HYDROPOWER AND DAMS IN ASIA - Rehabilitation of the Bai Thuong weir and headworks in Vietnam
Online Contents | 2001
|Spillway Rehabilitation: A Labyrinth Weir Design Tool
British Library Conference Proceedings | 2011
|