Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Diversion Tunnel for Doyang Hydroelectric Project - A Case Study
Construction of Diversion Tunnel for Doyang Hydroelectric Project - A Case Study
Construction of Diversion Tunnel for Doyang Hydroelectric Project - A Case Study
Khali, R. K. (Autor:in) / Varangaonkar, R. D. (Autor:in) / Kaushish, S. P. / Ramamurthy, T. / International Tunnelling Association / India
International conference, Tunnelling Asia '2000; need for accelerated underground construction, issues and challenges ; 2000 ; New Delhi
01.01.2000
9 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of the diversion tunnel of the Chirkey Hydroelectric Station
Online Contents | 1974
|Construction of the diversion tunnel of the Chirkey Hydroelectric Station
Springer Verlag | 1974
|Construction of the diversion pressure tunnel of the Inguri hydroelectric station
Online Contents | 1980
|Construction of the diversion pressure tunnel of the Inguri hydroelectric station
Springer Verlag | 1980
|British Library Online Contents | 1996
|