Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ranganadi Hydroelectric Project - Construction Features of Diversion Tunnel and Rectification/Restoration After Collapse of Intake Portal
Ranganadi Hydroelectric Project - Construction Features of Diversion Tunnel and Rectification/Restoration After Collapse of Intake Portal
Ranganadi Hydroelectric Project - Construction Features of Diversion Tunnel and Rectification/Restoration After Collapse of Intake Portal
Kunjayyappan, M. V. (Autor:in) / Dam, A. K. (Autor:in) / Bora, U. (Autor:in)
01.01.1996
5 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of Diversion Tunnel for Doyang Hydroelectric Project - A Case Study
British Library Conference Proceedings | 2000
|Construction of the diversion tunnel of the Chirkey Hydroelectric Station
Springer Verlag | 1974
|Construction of the diversion tunnel of the Chirkey Hydroelectric Station
Online Contents | 1974
|Construction of the diversion pressure tunnel of the Inguri hydroelectric station
Online Contents | 1980
|