Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Assessment and Repair of a Hydroelectric Power Plant Concrete Dam Damage After 43 Years of Operation
Assessment and Repair of a Hydroelectric Power Plant Concrete Dam Damage After 43 Years of Operation
Assessment and Repair of a Hydroelectric Power Plant Concrete Dam Damage After 43 Years of Operation
Portella, K. F. (Autor:in) / Garcia, C. M. (Autor:in) / Cantao, M. P. (Autor:in) / de Souza, G. P. (Autor:in) / Filho, V. S. (Autor:in) / Ferreira, E. S. (Autor:in) / Nogueira, J. R. G. (Autor:in) / Biondi, J. C. (Autor:in) / United States Society on Dams
Annual lecture; 21st, United States Society on Dams; Future of dams and their reservoirs ; 2001 ; Denver, CO
01.01.2002
14 pages
Aufsatz (Konferenz)
Englisch
USSD , dams , reservoirs
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
10 years of operation of the Upper Tuloma hydroelectric plant
Springer Verlag | 1975
|10 years of operation of the Upper Tuloma hydroelectric plant
Online Contents | 1975
|Stability Assessment of Concrete Structures at the Vilyui-3 Hydroelectric Power Plant
Online Contents | 2001
|