A platform for research: civil engineering, architecture and urbanism
Assessment and Repair of a Hydroelectric Power Plant Concrete Dam Damage After 43 Years of Operation
Assessment and Repair of a Hydroelectric Power Plant Concrete Dam Damage After 43 Years of Operation
Assessment and Repair of a Hydroelectric Power Plant Concrete Dam Damage After 43 Years of Operation
Portella, K. F. (author) / Garcia, C. M. (author) / Cantao, M. P. (author) / de Souza, G. P. (author) / Filho, V. S. (author) / Ferreira, E. S. (author) / Nogueira, J. R. G. (author) / Biondi, J. C. (author) / United States Society on Dams
Annual lecture; 21st, United States Society on Dams; Future of dams and their reservoirs ; 2001 ; Denver, CO
2002-01-01
14 pages
Conference paper
English
USSD , dams , reservoirs
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
10 years of operation of the Upper Tuloma hydroelectric plant
Springer Verlag | 1975
|10 years of operation of the Upper Tuloma hydroelectric plant
Online Contents | 1975
|Stability Assessment of Concrete Structures at the Vilyui-3 Hydroelectric Power Plant
Online Contents | 2001
|