Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design of the Third Phase RCC Cofferdam of the Three Gorges Project
Design of the Third Phase RCC Cofferdam of the Three Gorges Project
Design of the Third Phase RCC Cofferdam of the Three Gorges Project
Xianming, C. (Autor:in) / Wenwei, L. (Autor:in) / Kaushish, S. P. / Chawla, A. S. / Central Board of Irrigation and Power / Indian Committee on Large Dams (Incold)
Seminar, Roller compacted concrete dams ; 2001 ; New Delhi, India
Roller compacted concrete dams ; 22-27
01.01.2002
6 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction process simulation for the RCC cofferdam in Three Gorges Project
British Library Conference Proceedings | 2004
|Dispatching Operation Schemes of the Three Gorges Project in Cofferdam Impoundment Period
British Library Conference Proceedings | 2004
|The cut-off walls in the second-phase cofferdam of the three Gorges project
British Library Conference Proceedings | 2000
|Seepage problems of deepwater high earth-rock cofferdam in Three Gorges Project
British Library Online Contents | 2005
|Several problems on demolishing third phase RCC cofferdam of three gorges dam projects by blasting
British Library Conference Proceedings | 2003
|