Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dispatching Operation Schemes of the Three Gorges Project in Cofferdam Impoundment Period
9th:; International symposium, River sedimentation; interactions between fluvial systems and hydraulic projects and pertinent environmental impacts ; 2004 ; Yichang, China
01.01.2004
7 pages
See also 6846.847001V for papers held on CD-ROM
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction process simulation for the RCC cofferdam in Three Gorges Project
British Library Conference Proceedings | 2004
|Design of the Third Phase RCC Cofferdam of the Three Gorges Project
British Library Conference Proceedings | 2002
|Seepage problems of deepwater high earth-rock cofferdam in Three Gorges Project
British Library Online Contents | 2005
|Study on properties of RCC for Cofferdam III of the Three Gorges Project
British Library Conference Proceedings | 2003
|Construction of cut-off walls in stages II cofferdam for Three Gorges Project (China)
British Library Conference Proceedings | 1999
|