Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of the Shintakachiho Bridge Which is Built up of the Inverted Langer Concrete Arch Bridge
Construction of the Shintakachiho Bridge Which is Built up of the Inverted Langer Concrete Arch Bridge
Construction of the Shintakachiho Bridge Which is Built up of the Inverted Langer Concrete Arch Bridge
Baba, M. (Autor:in) / Turuda, S. (Autor:in) / Funakawa, Y. (Autor:in) / Ikeda, M. (Autor:in) / Japan Prestressed Concrete Engineering Association / Nihon Konkurito Kogaku Kyokai
1st:; CONGRESS, Fib; Concrete structures in the 21st century ; 2002 ; Osaka, Japan
Fib; Concrete structures in the 21st century ; 1-93-1-94
01.01.2002
93 pages
VOL 1 OF 8
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2002
|A Prestress Concrete Bridge with an Inverted Langer Arch in Liyutan Bridge Construction Project
British Library Conference Proceedings | 1995
|Unique erection method for Amakogawa bridge - an inverted Langer fixed arch bridge
British Library Conference Proceedings | 1994
|Concrete arch bridge built under difficulties
Engineering Index Backfile | 1928
Long arch bridge built of slag concrete
Engineering Index Backfile | 1921
|