Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Unique erection method for Amakogawa bridge - an inverted Langer fixed arch bridge
Unique erection method for Amakogawa bridge - an inverted Langer fixed arch bridge
Unique erection method for Amakogawa bridge - an inverted Langer fixed arch bridge
Horiguchi, M. (Autor:in) / Sadamitsu, M. (Autor:in) / Nakahara, J. (Autor:in) / Okada, K. (Autor:in) / Federation Internationale de la Precontrainte
12th Congress, FIP '94 ; 1994 ; Washington; DC
01.01.1994
F114-F119
2; vols
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Prefabricated inverted arch bridge girder erection machine and using method thereof
Europäisches Patentamt | 2023
|Prefabricated inverted arch bridge girder erection machine and using method thereof
Europäisches Patentamt | 2023
|A Prestress Concrete Bridge with an Inverted Langer Arch in Liyutan Bridge Construction Project
British Library Conference Proceedings | 1995
|Closure to Erection of Arch Bridge
ASCE | 2021
|Discussion on Erection of Arch Bridge
ASCE | 2021
|