Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures
Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures
Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures
Junrui, C. (Autor:in) / Shouyi, L. (Autor:in) / Wieland, M. / Ren, Q. / Tan, J. S. Y.
New developments in dam engineering
New developments in dam engineering ; 171-176
01.01.2004
6 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimum thickness of curtain grouting on dam foundation with minimum seepage pressure resultant
British Library Online Contents | 2012
|Grouting device for dam anti-seepage curtain construction
Europäisches Patentamt | 2021
|Construction method for dam anti-seepage curtain grouting
Europäisches Patentamt | 2024
|Construction method for dam body anti-seepage curtain grouting
Europäisches Patentamt | 2024
|Visual experiment method for simulating grouting effect of anti-seepage curtain
Europäisches Patentamt | 2024
|