A platform for research: civil engineering, architecture and urbanism
Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures
Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures
Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures
Junrui, C. (author) / Shouyi, L. (author) / Wieland, M. / Ren, Q. / Tan, J. S. Y.
New developments in dam engineering
New developments in dam engineering ; 171-176
2004-01-01
6 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimum thickness of curtain grouting on dam foundation with minimum seepage pressure resultant
British Library Online Contents | 2012
|Construction method for dam anti-seepage curtain grouting
European Patent Office | 2024
|Grouting device for dam anti-seepage curtain construction
European Patent Office | 2021
|Construction method for dam body anti-seepage curtain grouting
European Patent Office | 2024
|Visual experiment method for simulating grouting effect of anti-seepage curtain
European Patent Office | 2024
|