Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Collapse and Remining of Tunnel TO8 at THSRC Contract C230
Collapse and Remining of Tunnel TO8 at THSRC Contract C230
Collapse and Remining of Tunnel TO8 at THSRC Contract C230
Hemphill, G. B. (Autor:in) / Kim, J. K. (Autor:in) / Stewart, W. (Autor:in) / Tinkler, J. (Autor:in) / Hutton, J. D. / Rogstad, W. D. / Society of Mining, Metallurgy and Exploration
17th, Rapid excavation and tunneling conference ; 2005 ; Seattle, WA
01.01.2005
10 pages
Also known as RETC
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Methods of re-mining tunnel T08 at THSRC contract C230 after a collapse
British Library Online Contents | 2006
|Methods of re-mining tunnel T08 at THSRC contract C230 after a collapse
British Library Conference Proceedings | 2006
|Remining of Power Tunnel Face-3 in Chamera Project Himachal Pradesh - A Case Study
British Library Conference Proceedings | 2000
|Assessment of Contaminant Load Changes Caused by Remining Abandoned Coal Mines
British Library Conference Proceedings | 1994
|