Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods of re-mining tunnel T08 at THSRC contract C230 after a collapse
Methods of re-mining tunnel T08 at THSRC contract C230 after a collapse
Methods of re-mining tunnel T08 at THSRC contract C230 after a collapse
Kim, J. K. (Autor:in) / Hemphill, G. B. (Autor:in) / Stewart, W. (Autor:in) / Tinkler, J. (Autor:in) / Lee, I.-M. / Yoo, C. / You, K.-H. / International Tunnelling Association
AITES-ITA world tunnel congress; Safety in the underground space ; 2006 ; Seoul
01.01.2006
320 pages
CD-ROM in pocket attached to inside back cover of journal issue
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Methods of re-mining tunnel T08 at THSRC contract C230 after a collapse
British Library Online Contents | 2006
|Methods of re-mining tunnel T08 at THSRC contract C230 after a collapse
Online Contents | 2006
|Collapse and Remining of Tunnel TO8 at THSRC Contract C230
British Library Conference Proceedings | 2005
|Collapse of Clifton hall tunnel
Engineering Index Backfile | 1954
Interstate 90 Connector Tunnel ceiling collapse
British Library Online Contents | 2013