Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Continuous tight curved belt conveyor of R30m did a TBM drift excavation a lot of good-Shimizu No.4 tunnel on 2nd Tomei Expressway
Continuous tight curved belt conveyor of R30m did a TBM drift excavation a lot of good-Shimizu No.4 tunnel on 2nd Tomei Expressway
Continuous tight curved belt conveyor of R30m did a TBM drift excavation a lot of good-Shimizu No.4 tunnel on 2nd Tomei Expressway
Noda, M. (Autor:in) / Inoue, Y. (Autor:in) / Fujita, T. (Autor:in) / Akiyoshi, K. (Autor:in) / Erdem, Y. / Solak, T.
31ST, AITES-ITA world tunnel congress; Underground space use: analysis of the past and lessons for the future ; 2005 ; Istanbul
01.01.2005
8 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Tunnel excavation penetrating active landslide area - second-TOMEI Expressway Inasa No. 2 Tunnel
British Library Conference Proceedings | 2005
|British Library Conference Proceedings | 2003
|The new Tomei-Meishin Expressway project
British Library Conference Proceedings | 1998
|Highway Park: Tomei Expressway Highway Park Project
British Library Online Contents | 1998
Measurement and Characteristic of Traffic Loads Tomei Expressway
British Library Online Contents | 1992
|