A platform for research: civil engineering, architecture and urbanism
Continuous tight curved belt conveyor of R30m did a TBM drift excavation a lot of good-Shimizu No.4 tunnel on 2nd Tomei Expressway
Continuous tight curved belt conveyor of R30m did a TBM drift excavation a lot of good-Shimizu No.4 tunnel on 2nd Tomei Expressway
Continuous tight curved belt conveyor of R30m did a TBM drift excavation a lot of good-Shimizu No.4 tunnel on 2nd Tomei Expressway
Noda, M. (author) / Inoue, Y. (author) / Fujita, T. (author) / Akiyoshi, K. (author) / Erdem, Y. / Solak, T.
31ST, AITES-ITA world tunnel congress; Underground space use: analysis of the past and lessons for the future ; 2005 ; Istanbul
2005-01-01
8 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Tunnel excavation penetrating active landslide area - second-TOMEI Expressway Inasa No. 2 Tunnel
British Library Conference Proceedings | 2005
|The new Tomei-Meishin Expressway project
British Library Conference Proceedings | 1998
|British Library Conference Proceedings | 2003
|Highway Park: Tomei Expressway Highway Park Project
British Library Online Contents | 1998
Measurement and Characteristic of Traffic Loads Tomei Expressway
British Library Online Contents | 1992
|