Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Successful Application of the Design/Build Approach at Pine Brook Dam
Successful Application of the Design/Build Approach at Pine Brook Dam
Successful Application of the Design/Build Approach at Pine Brook Dam
Shannon, D. (Autor:in) / Allen, J. (Autor:in) / de Haas, R. (Autor:in) / United States Society on Dams
26th:; Annual conference, United States Society on Dams; The role of dams in the 21st century ; 2006 ; San Antonio, TX
01.01.2006
12 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2007
|How design/build at Pine Brook Dam dramatically reduces schedule and costs
British Library Conference Proceedings | 2010
|Determinants of Successful Design-Build Projects
British Library Online Contents | 2008
|Determinants of Successful Design-Build Projects
Online Contents | 2008
|