Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
How to Build a New RCC Dam for 40% Less - Successful Application of the Design-build Approach at Pine Brook
How to Build a New RCC Dam for 40% Less - Successful Application of the Design-build Approach at Pine Brook
How to Build a New RCC Dam for 40% Less - Successful Application of the Design-build Approach at Pine Brook
Nordback, K.L. (Autor:in) / Bowen, J.S. (Autor:in) / Association of State Dam Safety Officials
Annual Conference, Association of State Dam Safety Officials ; 2007 ; Austin, TX
01.01.2007
10 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Successful Application of the Design/Build Approach at Pine Brook Dam
British Library Conference Proceedings | 2006
|How design/build at Pine Brook Dam dramatically reduces schedule and costs
British Library Conference Proceedings | 2010
|Determinants of Successful Design-Build Projects
British Library Online Contents | 2008
|Determinants of Successful Design-Build Projects
Online Contents | 2008
|Taylor & Francis Verlag | 2012
|