Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Recycling of an Open Deck Half-Through-Plate-Girder Span and Conversion to a Concrete Ballast Deck Through-Plate-Girder Span
Recycling of an Open Deck Half-Through-Plate-Girder Span and Conversion to a Concrete Ballast Deck Through-Plate-Girder Span
Recycling of an Open Deck Half-Through-Plate-Girder Span and Conversion to a Concrete Ballast Deck Through-Plate-Girder Span
Small, G. (Autor:in) / Ketler, L. (Autor:in) / American Railway Engineering & Maintenance of Way Association
ANNUAL CONFERENCE, American Railway Engineering & Maintenance of Way Association; AREMA 2006 ; 2006 ; Louisville, KY
01.01.2006
16 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The design of a 50-ft. deck span plate girder railway bridge
Engineering Index Backfile | 1924
|Engineering Index Backfile | 1913
Engineering Index Backfile | 1899
Large-span deck type arch bridge girder hoisting construction method
Europäisches Patentamt | 2024
|