A platform for research: civil engineering, architecture and urbanism
Recycling of an Open Deck Half-Through-Plate-Girder Span and Conversion to a Concrete Ballast Deck Through-Plate-Girder Span
Recycling of an Open Deck Half-Through-Plate-Girder Span and Conversion to a Concrete Ballast Deck Through-Plate-Girder Span
Recycling of an Open Deck Half-Through-Plate-Girder Span and Conversion to a Concrete Ballast Deck Through-Plate-Girder Span
Small, G. (author) / Ketler, L. (author) / American Railway Engineering & Maintenance of Way Association
ANNUAL CONFERENCE, American Railway Engineering & Maintenance of Way Association; AREMA 2006 ; 2006 ; Louisville, KY
2006-01-01
16 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The design of a 50-ft. deck span plate girder railway bridge
Engineering Index Backfile | 1924
|Engineering Index Backfile | 1913
Engineering Index Backfile | 1899
Large-span deck type arch bridge girder hoisting construction method
European Patent Office | 2024
|