Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
GCE-337 CONCRETE CONSTRUCTION 1600 METRES BELOW THE EARTH'S SURFACE
GCE-337 CONCRETE CONSTRUCTION 1600 METRES BELOW THE EARTH'S SURFACE
GCE-337 CONCRETE CONSTRUCTION 1600 METRES BELOW THE EARTH'S SURFACE
Hopkins, D.S. (Autor:in) / Hollingsworth, D. (Autor:in) / Munro, R.E. (Autor:in) / Mitchell, S. (Autor:in) / Girard, R. (Autor:in) / Thomas, M.D.A. (Autor:in) / Canadian Society for Civil Engineering
Annual Conference; 31st, Canadian Society for Civil Engineering ; 2003 ; Moncton, Canada
01.01.2003
30 pages
Held on CD-ROM. Abstracts in print form; Copy of CD-ROM held in Conference Index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of a well in reinforced concrete 20 metres deep
Engineering Index Backfile | 1903
|Climate Change Stored Below the Earth's Surface
British Library Conference Proceedings | 1997
|Reservoir of 3,000 cubic metres capacity in reinforced concrete
Engineering Index Backfile | 1900
1,600 metres of reinforced concrete wall on the Lehmann system
Engineering Index Backfile | 1911
|Eighteen Yards and Nine Metres
Online Contents | 2001
|