A platform for research: civil engineering, architecture and urbanism
GCE-337 CONCRETE CONSTRUCTION 1600 METRES BELOW THE EARTH'S SURFACE
GCE-337 CONCRETE CONSTRUCTION 1600 METRES BELOW THE EARTH'S SURFACE
GCE-337 CONCRETE CONSTRUCTION 1600 METRES BELOW THE EARTH'S SURFACE
Hopkins, D.S. (author) / Hollingsworth, D. (author) / Munro, R.E. (author) / Mitchell, S. (author) / Girard, R. (author) / Thomas, M.D.A. (author) / Canadian Society for Civil Engineering
Annual Conference; 31st, Canadian Society for Civil Engineering ; 2003 ; Moncton, Canada
2003-01-01
30 pages
Held on CD-ROM. Abstracts in print form; Copy of CD-ROM held in Conference Index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of a well in reinforced concrete 20 metres deep
Engineering Index Backfile | 1903
|Climate Change Stored Below the Earth's Surface
British Library Conference Proceedings | 1997
|Reservoir of 3,000 cubic metres capacity in reinforced concrete
Engineering Index Backfile | 1900
Eighteen Yards and Nine Metres
Online Contents | 2001
|1,600 metres of reinforced concrete wall on the Lehmann system
Engineering Index Backfile | 1911
|