Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
Fulcher, B. (Autor:in) / Bell, M. (Autor:in) / Garshol, K. (Autor:in) / Roach, M.F.
North American Tunneling Conference ; 2008 ; San Francisco, CA
North American Tunneling Conference ; 749-765
01.01.2008
17 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Special Applications for Jet Grouting: Underpinning, Excavation Support and Ground -water Control
British Library Conference Proceedings | 1995
|Ground improvement by grouting
British Library Conference Proceedings | 2001
|Excavation Support and Foundation Ground Improvement Using Jet Grouting Method – A Case Study
DOAJ | 2023
|