A platform for research: civil engineering, architecture and urbanism
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
Fulcher, B. (author) / Bell, M. (author) / Garshol, K. (author) / Roach, M.F.
North American Tunneling Conference ; 2008 ; San Francisco, CA
North American Tunneling Conference ; 749-765
2008-01-01
17 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Special Applications for Jet Grouting: Underpinning, Excavation Support and Ground -water Control
British Library Conference Proceedings | 1995
|Ground improvement by grouting
British Library Conference Proceedings | 2001
|Excavation Support and Foundation Ground Improvement Using Jet Grouting Method – A Case Study
DOAJ | 2023
|