Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pipe Jacking Through Hardpan: A Case History-North Gratiot Interceptor Drain Phase I
Pipe Jacking Through Hardpan: A Case History-North Gratiot Interceptor Drain Phase I
Pipe Jacking Through Hardpan: A Case History-North Gratiot Interceptor Drain Phase I
Alberts, J.B. (Autor:in) / Edberg, J.R. (Autor:in) / Graboske, K. (Autor:in) / Wilson, G. (Autor:in) / Mancini, S. (Autor:in) / Eckert, L.R.
North American tunneling conference ; 2010 ; Portland, OR
01.01.2010
9 pages
Includes bibliographical references and index; Also known as NAT 2010
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Study on Construction Technology of Drain Board for Foundation Covered with Thicker Hardpan
Trans Tech Publications | 2014
|