A platform for research: civil engineering, architecture and urbanism
Pipe Jacking Through Hardpan: A Case History-North Gratiot Interceptor Drain Phase I
Pipe Jacking Through Hardpan: A Case History-North Gratiot Interceptor Drain Phase I
Pipe Jacking Through Hardpan: A Case History-North Gratiot Interceptor Drain Phase I
Alberts, J.B. (author) / Edberg, J.R. (author) / Graboske, K. (author) / Wilson, G. (author) / Mancini, S. (author) / Eckert, L.R.
North American tunneling conference ; 2010 ; Portland, OR
2010-01-01
9 pages
Includes bibliographical references and index; Also known as NAT 2010
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Study on Construction Technology of Drain Board for Foundation Covered with Thicker Hardpan
Trans Tech Publications | 2014
|