Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridges and Transportation The Development and Implementation of a Bridge Deck Precast Overhang System
Bridges and Transportation The Development and Implementation of a Bridge Deck Precast Overhang System
Bridges and Transportation The Development and Implementation of a Bridge Deck Precast Overhang System
Ley, T. (Autor:in) / Browne, R. (Autor:in) / Abrams, J. (Autor:in) / Gonzalez, R. (Autor:in) / Bussell, L. (Autor:in) / Pardon, M. (Autor:in) / Valles, F. (Autor:in) / Federation internationale du beton; Precast/Prestressed Concrete Institute
FIB Congress ; 2010 ; Washington, DC
FIB Congress ; 427
01.01.2010
427 pages
Held in e-store (RMS)
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Development of a Precast Bridge Deck Overhang System
NTIS | 2011
|Experimental Performance of Full-Depth Precast, Prestressed Concrete Overhang, Bridge Deck Panels
British Library Online Contents | 2010
|Modified Yield Line Theory for Full-Depth Precast Concrete Bridge Deck Overhang Panels
British Library Online Contents | 2011
|