A platform for research: civil engineering, architecture and urbanism
Bridges and Transportation The Development and Implementation of a Bridge Deck Precast Overhang System
Bridges and Transportation The Development and Implementation of a Bridge Deck Precast Overhang System
Bridges and Transportation The Development and Implementation of a Bridge Deck Precast Overhang System
Ley, T. (author) / Browne, R. (author) / Abrams, J. (author) / Gonzalez, R. (author) / Bussell, L. (author) / Pardon, M. (author) / Valles, F. (author) / Federation internationale du beton; Precast/Prestressed Concrete Institute
FIB Congress ; 2010 ; Washington, DC
FIB Congress ; 427
2010-01-01
427 pages
Held in e-store (RMS)
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Development of a Precast Bridge Deck Overhang System
NTIS | 2011
|Experimental Performance of Full-Depth Precast, Prestressed Concrete Overhang, Bridge Deck Panels
British Library Online Contents | 2010
|Modified Yield Line Theory for Full-Depth Precast Concrete Bridge Deck Overhang Panels
British Library Online Contents | 2011
|