Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The New Fornello Viaduct: Method of Seismically Strengthening the Piers and Replacing the Deck Without Interrupting Traffic
The New Fornello Viaduct: Method of Seismically Strengthening the Piers and Replacing the Deck Without Interrupting Traffic
The New Fornello Viaduct: Method of Seismically Strengthening the Piers and Replacing the Deck Without Interrupting Traffic
Di Marco, R. (Autor:in) / Mele, M. (Autor:in) / International Association for Bridge and Structural Engineering
IABSE Symposium Venice 2010: Large structures and infrastructures for environmentally constrained and urbanised areas ; 2010 ; Venice, Italy
01.01.2010
2 pages
"Venice, Italy, September 22-24, 2010"--CD-ROM surface. Includes bibliographical references and index. Large structures and infrastructures for environmentally constrained and urbinised areas : 34th IABSE Symposium on Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Replacing railway bridges without interrupting traffic
Engineering Index Backfile | 1926
|Engineering Index Backfile | 1965
|Replacing east Canyon dam without interrupting operations
Engineering Index Backfile | 1966
|Réunion Island’s New Coastal Road: A Viaduct with a Wide Precast Deck and Piers
Taylor & Francis Verlag | 2018
|