A platform for research: civil engineering, architecture and urbanism
The New Fornello Viaduct: Method of Seismically Strengthening the Piers and Replacing the Deck Without Interrupting Traffic
The New Fornello Viaduct: Method of Seismically Strengthening the Piers and Replacing the Deck Without Interrupting Traffic
The New Fornello Viaduct: Method of Seismically Strengthening the Piers and Replacing the Deck Without Interrupting Traffic
Di Marco, R. (author) / Mele, M. (author) / International Association for Bridge and Structural Engineering
IABSE Symposium Venice 2010: Large structures and infrastructures for environmentally constrained and urbanised areas ; 2010 ; Venice, Italy
2010-01-01
2 pages
"Venice, Italy, September 22-24, 2010"--CD-ROM surface. Includes bibliographical references and index. Large structures and infrastructures for environmentally constrained and urbinised areas : 34th IABSE Symposium on Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Replacing railway bridges without interrupting traffic
Engineering Index Backfile | 1926
|Engineering Index Backfile | 1965
|Replacing east Canyon dam without interrupting operations
Engineering Index Backfile | 1966
|Réunion Island’s New Coastal Road: A Viaduct with a Wide Precast Deck and Piers
Taylor & Francis Verlag | 2018
|