Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Using Electimize to Solve the Time-Cost-Tradeoff Problem in Construction Engineering
Using Electimize to Solve the Time-Cost-Tradeoff Problem in Construction Engineering
Using Electimize to Solve the Time-Cost-Tradeoff Problem in Construction Engineering
Abdel-Raheem, M. (Autor:in) / Khalafallah, A. (Autor:in) / Zhu, Y. / Issa, R.R. / American Society of Civil Engineers
International workshop on computing in civil engineering ; 2011 ; Miami, FL
01.01.2011
8 pages
Includes bibliographical references and indexes
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Flexible Model for Time/Cost Tradeoff Problem
British Library Online Contents | 2004
|Flexible Model for Time-Cost Tradeoff Problem
Online Contents | 2004
|Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
Springer Verlag | 2019
|Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
Online Contents | 2019
|