Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Risk assessment and the damping measures of the tunnel transfixion section using drilling and blasting construction method
Risk assessment and the damping measures of the tunnel transfixion section using drilling and blasting construction method
Risk assessment and the damping measures of the tunnel transfixion section using drilling and blasting construction method
You, P. (Autor:in) / Mou, R. (Autor:in) / Jiang, M. / Liu, F. / Bolton, M.
International Symposium on Geomechanics and Geotechnics : from Micro to Macro ; 2010 ; Shanghai, China
01.01.2010
6 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction Control Technology of Drilling and Blasting Method in Multi-Arch Tunnel
British Library Conference Proceedings | 2012
|Construction Control Technology of Drilling and Blasting Method in Multi-Arch Tunnel
Trans Tech Publications | 2012
|Blasting delays in tunnel construction
Engineering Index Backfile | 1935
|Drilling and blasting at the Ojuela drainage tunnel
Engineering Index Backfile | 1928
|Laboratory experiments on solute transport in a partial transfixion single fracture
British Library Online Contents | 2011
|