Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Progressing Rate of Ba-Guah-Shan Gravel Tunnel Construction
Progressing Rate of Ba-Guah-Shan Gravel Tunnel Construction
Progressing Rate of Ba-Guah-Shan Gravel Tunnel Construction
Hsu, S.-C. (Autor:in) / Huang, W.-M. (Autor:in) / Yang, M.-D. (Autor:in) / American Society of Civil Engineers
Conference, Contemporary topics on testing, modeling, and case studies of geomaterials, pavements, and tunnels ; 2011 ; Hunan, China
01.01.2011
9 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Medway tunnel progressing on schedule
British Library Online Contents | 1994
Channel Tunnel Rail Link progressing well
Online Contents | 2001
The Gotthard Base Tunnel: Construction Work is progressing in 4 Part-sections
British Library Online Contents | 2000
TUNNELLING How is the Niagara power tunnel project progressing?
Online Contents | 2010