A platform for research: civil engineering, architecture and urbanism
Progressing Rate of Ba-Guah-Shan Gravel Tunnel Construction
Progressing Rate of Ba-Guah-Shan Gravel Tunnel Construction
Progressing Rate of Ba-Guah-Shan Gravel Tunnel Construction
Hsu, S.-C. (author) / Huang, W.-M. (author) / Yang, M.-D. (author) / American Society of Civil Engineers
Conference, Contemporary topics on testing, modeling, and case studies of geomaterials, pavements, and tunnels ; 2011 ; Hunan, China
2011-01-01
9 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Medway tunnel progressing on schedule
British Library Online Contents | 1994
Channel Tunnel Rail Link progressing well
Online Contents | 2001
The Gotthard Base Tunnel: Construction Work is progressing in 4 Part-sections
British Library Online Contents | 2000
TUNNELLING How is the Niagara power tunnel project progressing?
Online Contents | 2010