Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cutoff Wall Construction by the Self-Hardening Slurry Method at the Herbert Hoover Dike, FL
Cutoff Wall Construction by the Self-Hardening Slurry Method at the Herbert Hoover Dike, FL
Cutoff Wall Construction by the Self-Hardening Slurry Method at the Herbert Hoover Dike, FL
Taylor, J. (Autor:in) / Morales, C. (Autor:in) / Blackwell, D. (Autor:in) / Association of State Dam Safety Officials
Conference, Association of State Dam Safety Officials ; 2010 ; Seattle, WA
01.01.2010
16 pages
Includes bibliographical references and author index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Herbert Hoover Dike: Major Rehabilitation
British Library Conference Proceedings | 2006
|Herbert Hoover Dike: Major Rehabilitation
British Library Conference Proceedings | 2007
|British Library Conference Proceedings | 2009
|Installation of a Seepage Cutoff Wall at the Herbert Hoover Dike Using the Cutter Soil Mixing Method
British Library Conference Proceedings | 2012
|